top of page

Middle of the house Hallway

Has internal windows on the wall of room 004. 

Fill in windows, paint walls and trim.

Hannah's Room

Has internal windows on the wall of middle hallway. 

Fill in windows, paint walls and trim; new custom door.  Paint fan and light fixture.  Move back vent to storage room that has no vent.

Carrie's Room

Paint walls and trim, new custom door.  Patch wall where the server used to go.  Replace fan.

Room 002

Left paint as is; new custom door and threshold.  Replace fan.

Room 001

Landlord is replacing external large window.  Hopefully adding insulation.

Paint and replace fan, custom door. Sheet rock entire room, add insulation to external walls, trim out windows and closet.

Back Hallway (001) 

This will be the new entrance.

Cutting a hole for a doorway straight in to the new waiting area.  Adding a wall just before the doorway of room 001; laying tile to create a small entry space leading only into the waiting area.

Painting and adding ship lap in small hallway outside bathroom and back room.