Middle of the house Hallway
Has internal windows on the wall of room 004.
Fill in windows, paint walls and trim.
Out of gallery
Hannah's Room
Has internal windows on the wall of middle hallway.
Fill in windows, paint walls and trim; new custom door. Paint fan and light fixture. Move back vent to storage room that has no vent.
Out of gallery
Carrie's Room
Paint walls and trim, new custom door. Patch wall where the server used to go. Replace fan.
Out of gallery
Room 002
Left paint as is; new custom door and threshold. Replace fan.
Out of gallery
Room 001
Landlord is replacing external large window. Hopefully adding insulation.
Paint and replace fan, custom door. Sheet rock entire room, add insulation to external walls, trim out windows and closet.
Out of gallery
Back Hallway (001)
This will be the new entrance.
Cutting a hole for a doorway straight in to the new waiting area. Adding a wall just before the doorway of room 001; laying tile to create a small entry space leading only into the waiting area.
Painting and adding ship lap in small hallway outside bathroom and back room.











Lobby
Cutting a hole for a doorway straight in from the entrance. Painting, replace fan, ship lap on back wall and hallway.

























Kitchen
Painted; adding ceiling hung curtain.
Out of gallery
Bathroom
Painted; changing out hardware.
Out of gallery